WBA ENERGY

POWER OF THE WIND IN YOUR HANDS

One of the cleanest ways to produce electricity is to convert wind energy into electricity

WBA Energy is a company with activities in the field of wind energy and other forms of energy produced from renewable sources, with the aim of raising collective awareness of the importance of renewable energy sources and improving the energy portfolio of the Republic of Serbia in this area.

The positive effects of wind farms are numerous and contribute not only to economic efficiency, road construction and job creation, but also to the preservation of health and the environment in which we live, by reducing carbon dioxide emissions, reducing the use of fossil fuel power plants and reducing the greenhouse effect, deforestation, etc.

Wind farm project

The wind farm project involves the use of renewable – aeolian energy, with the application of clean technology for its exploitation. The negative impacts are of limited intensity and spatial dimensions with adequate measures and the highest standards of protection for their prevention. (This situation was contributed by the cooperation with the competent institutions, especially with the Provincial Institute for Nature Protection from Novi Sad, whose recommendations, conditions and guidelines, especially in determining the optimal spatial disposition of wind turbines, were maximally respected)

The future of energy in Serbia is certainly in renewable energy sources.

Wind energy in this part of the Balkans has a capacity of 1,300 MW – 1,500 MW or about 2.3-2.4TWh / year. So far, surveys and analyzes have located several of the most promising locations for wind farms, such as: Košava area of southern Banat and eastern Serbia, then the eastern side of Kopaonik, Zlatibor, Pešter, mountain passes above 800 m above sea level, the valleys of the rivers Sava, Danube and Morava…

WIND FARMS

The potential of this green energy proves the great cost-effectiveness of building wind farms at the mentioned locations in Serbia. At one of those points, in the area of South Banat known for its basket, we are currently developing six projects. All six projects are in the municipality of Pancevo, in Dolovo, Kačarevo and Banatsko Novo Selo.

Bela Anta – 120 MW

  • LOCATION
    Dolovo, Municipality of Pančevo
  • MAXIMUM INSTALLED CAPACITY
    120,75 MW
  • MEAN WIND SPEED
    7,29m/s @ 125m
  • NUMBER OF TURBINES
    max 35

GRAND WIND PARK 270 MW

  • LOCATION
    Kačarevo and Banatsko Novo Selo, Municipality of Pančevo
  • MAXIMUM INSTALLED CAPACITY
    270 MW
  • MEAN WIND SPEED
    7,29m/s @ 125m
  • NUMBER OF TURBINES
    max 47

Dolovo 1 – 10 MW

  • LOCATION
    Dolovo, Municipality of Pančevo
  • MAXIMUM INSTALLED CAPACITY
    9,9 MW
  • MEAN WIND SPEED
    7,29m/s @ 125m
  • NUMBER OF TURBINES
    max 2

Dolovo 2 – 10 MW

  • LOCATION
    Dolovo, Municipality of Pančevo
  • MAXIMUM INSTALLED CAPACITY
    9,9 MW
  • MEAN WIND SPEED
    7,29m/s @ 125m
  • NUMBER OF TURBINES
    max 2

Dolovo 3 – 10 MW

  • LOCATION
    Dolovo, Municipality of Pančevo
  • MAXIMUM INSTALLED CAPACITY
    9,9 MW
  • MEAN WIND SPEED
    7,29m/s @ 125m
  • NUMBER OF TURBINES
    max 2

Dolovo 4 – 10 MW

  • LOCATION
    Dolovo, Municipality of Pančevo
  • MAXIMUM INSTALLED CAPACITY
    9,9 MW
  • MEAN WIND SPEED
    7,29m/s @ 125m
  • NUMBER OF TURBINES
    max 2

On the way to the realization of our vision, we have gathered top specialized staff from all relevant areas: construction, energy, ecology, law, economics.

Our vision is to gain a leading role in the development of wind farms in Serbia and act as investors until the final realization of wind farms.

Scroll to Top